2021
Based on the "past life, present life and future" of the development of the "biomass" industry as the prototype, based on the industry value proposition of "pioneer and leader of the biomass industry", to create the "low-carbon" development miniature scene of the whole industry chain of Long Energy. The stage play with the theme of "Carbon to peak carbon neutrality" was staged to tell the low-carbon "story" of Long Energy.
At 16:10 on December 22, 2021, The Inner Mongolia Biomass power generation project of Long Energy successfully broke the 210 million KWH mark, a record high, marking that the Biomass power generation project of Long Energy entered the forefront of the first-class biomass thermal power industry in China. This is under the guidance of the strategic deployment of the core talents of the group leadership, to mark the domestic first-class benchmark biomass thermal power enterprises, lift the overall strength, overcome difficulties, and all employees of Long Energy take advantage of the momentum to achieve outstanding performance.
-
2019
The renovation project of huairou old heating pipe network was completed smoothly, realizing the replacement of new and old pipe networks of Beijing heating project.
Inner Mongolia biomass thermal power project officially connected to the grid.
-
2018
Headquarter moving to Beijing CBD is a milestone in the history of the company. We will seek common development with friends from all walks of life in more fields and create a better future hand in hand.
-
2017
Shenyang coal to clean energy (biomass straw) million square meters of large-scale central heating demonstration project started
Inner Mongolia Hanglong Biomass Thermal Power Company with a total investment of 277 million yuan was registered and established with pile foundation construction.
-
2016
Lanzhou thermal project 80 tons of high efficiency pulverized coal high temperature hot water boiler put into use.
-
2015
Beijing thermal coal to gas project completed and put into use.
-
2014
Shenyang thermal power project completed and put into operation.
-
2013
Began to participate in the Beijing "coal reduction for coal, clean air" action, for changping, Haidian, Chaoyang, Tongzhou, Huairou and other districts and counties supply environmental protection anthracite brique-free; Started to supply industrial briquette to Nippon Steel plant.
-
2011
Investment and construction of Beijing thermal project, Shenyang thermal project.
-
2009
Establish biomass boiler plant (Grade B) in Yanqing; The first biomass coal plant (capacity: 100,000 tons) was established.
-
2007
The first biomass heating project was put into use in China Economic Daily.
-
2006
the first biomass fuel plant was built in Daxing District (a demonstration project of the Ministry of Agriculture).